Building an en-suite in a loft
conversion
Walls constructed and finished including carpentry.
Plumbing included within this project, saniflo macerator,
dealing with all waste from the en-suite, a negative head pump, dealing with all
the water requirements for the en-suite. and second cold water tank was fitted
in the loft to ensure sufficient water for the power shower.
Shower area, sink splash back and floor tiled
Light with built in extractor fitted
All of the above works completed by Paul Miles
converting a WC and bathroom into one room
Before
After